| Client: |
Soletanche Bachy Holding - Saceem |
| Location: |
Fray Bentos, Uruguay. |
| Builder: |
Soletanche Bachy Holding- Saceem |
| Period: |
2005 / 2006 |
| Cost: |
US$ 7.000.000 |
| Services: |
|
Project description:
The holding Soletanche Bachy – Saceem was in charge of the extension
of the multipurpose pier of Fray Bentos public port.
It consists of the extension of the public pier plus reinforcement
of the current mooring structure and a new mooring dolphin.
We developed the studies during the bid stage, prepared the preliminary
project and the executive project.
|