Profile
Services

Projects

In Progress

Clients
Staff
Contact
 
Projects:
ZÁRATE Terminal
EXOLGAN Container Terminal
EUROAMÉRICA Port Complex
International Bids
Sur Logistic Park
Ribera Sud Railway Terminal
Torres el Faro Fundations Project

San Antonio Este Floating Berth Expansion

Cold Storage HANDELSVEEM - ZÁRATE
Natal RGN (Brazil), Refrigerated cargo terminal
ODFJELL Terminal - Campana
Railroad Station - Zárate Terminal
Maripasa Port Terminal
Marsud - Reefer Container Terminal - Brazil
High Performance Train Project – Bs. As. Rosario
San Antonio Este Port – Maintenance Plan
Mbopicuá – Forest Products Terminal
Dock Sud - Morro Oeste Widening
River Piers at Esperanza and Pirai Ports
Lumut Heavy Cargo Pier (Malaysia) and Batam Pier (Indonesia)
San Antonio Este Pier Repair
Guayaquil Port Terminal
Assessment of Punta Colorada Port
Pier Extension - Fray Bentos
Depot Cubatao
Premises for Minerals in Matarani Port
MOLCA Grain Terminal
Container Terminal Extension in Montevideo
VITCO Liquid Bulk Cargo Terminal
IPS Algeciras
American Logistic Plant
Bahía Ancón Container Terminal - Peru
Punta Vegueta Minerals Termianl Project - Peru
Puerto Cortez Container Termianl - Honduras
Río de la Plata Terminals Extension
ODFJELL Chemical Products Terminal, Mejillones - Chile
    Río de la Plata Terminals Extension
Client: Terminales Río de la Plata (DPWorld)
Location: Puerto Nuevo - Buenos Aires Port.
Period: 2009 / 2011
Cost: US$ 20.000.000
Services:
Port and Transport Engineer Projects.

Project description:

A master plan study was performed in order to establish the best alternative to enlarge the container terminal.

As a consequence of this study, the new terminal layout was defined, together with the work necessary for its development, basically consisting of the front extension in Dock C and the reduction of the Third Jetty.

Our Engineering firm prepared the bidding engineering project for the works, comprising the building of a new 300 m berth, and the demolition and removal of a portion of the third jetty in order to enlarge the nautical maneuvering space for 300 m long large container ships.

The firm was on charge of work execution control.