The feasibility study, the preliminary project, the specification
and control of all field studies and the bidding project was successively
developed for the premises.
During 2 years, coordination was made of hydraulic and sedimentological
studies, geophysical studies, wave measurement, geotechnical studies
from the platform and breakwater modeling in the channel.
The project is at its final bidding stage for construction.