| Client: |
IPS - Asia |
| Location: |
Lumut, Malaysia - Batam, Indonesia |
| Period: |
2004 / 2005 - 2006 |
| Cost: |
US$ 1.600.000 |
| Services: |
|
Project description:
The firm executed both projects for the enlargement and reinforcement
of the existing piers in order to optimize them for transfer from
plant to ship and to 1,600 tn container cranes.
The project consisted in the reconstruction and extension of the
front, addition of piles to the existing structure and repair of
preexisting damages and pathologies as well as verification of the
structural capacity for projected cargo.
|