Profile
Services

Projects

In Progress

Clients
Staff
Contact
 
Projects:
ZÁRATE Terminal
EXOLGAN Container Terminal
EUROAMÉRICA Port Complex
International Bids
Sur Logistic Park
Ribera Sud Railway Terminal
Torres el Faro Fundations Project

San Antonio Este Floating Berth Expansion

Cold Storage HANDELSVEEM - ZÁRATE
Natal RGN (Brazil), Refrigerated cargo terminal
ODFJELL Terminal - Campana
Railroad Station - Zárate Terminal
Maripasa Port Terminal
Marsud - Reefer Container Terminal - Brazil
High Performance Train Project – Bs. As. Rosario
San Antonio Este Port – Maintenance Plan
Mbopicuá – Forest Products Terminal
Dock Sud - Morro Oeste Widening
River Piers at Esperanza and Pirai Ports
Lumut Heavy Cargo Pier (Malaysia) and Batam Pier (Indonesia)
San Antonio Este Pier Repair
Guayaquil Port Terminal
Assessment of Punta Colorada Port
Pier Extension - Fray Bentos
Depot Cubatao
Premises for Minerals in Matarani Port
MOLCA Grain Terminal
Container Terminal Extension in Montevideo
VITCO Liquid Bulk Cargo Terminal
IPS Algeciras
American Logistic Plant
Bahía Ancón Container Terminal - Peru
Punta Vegueta Minerals Termianl Project - Peru
Puerto Cortez Container Termianl - Honduras
Río de la Plata Terminals Extension
ODFJELL Chemical Products Terminal, Mejillones - Chile
    River Piers at Esperanza and Pirai Ports
Client: Alto Paraná S. A.
Location: Misiones
Period: 2004 / 2005
Cost: US$ 3.600.000
Services:
Port and Transport Engineering Projects
Structure Design and Project – Geotechnia and Foundations – Infrastructure Engineering

Project description:

The firm made the bid project for construction of two piers for the operation of barges, including access roads and complementary facilities.

Both projects provide for the operation of cranes on piers and access of trucks and transfer equipment.

Esperanza port project is under execution. It is a pile pier with back support structure that covers up to 16 meters of tide level variation.