| Client: |
Terminal Zárate S. A. |
| Location: |
ZARATE Industrial Park (Buenos
Aires) |
| Period: |
2001 - 2002 |
| Cost: |
US$ 3.000.000 |
| Services: |
|
Project description:
A rail road transfer terminal was projected and constructed. It links
the Ferrocarril NCA principal railway and the whole national system
through it, with TZ Port Terminal.
The project was developed in a 27 ha. lot. It is located in the
Parque Industrial Zárate, which is adjacent to NCA railway
and to the new route that links Ruta Nacional Nº 9 with Paraná
de las Palmas River, 1000 m far from the new container terminal.
First phase of the project comprises the construction of 6500 m
of railway, which are divided between the principal deviation, 2
manouvering branches, and 4 of the 15 operatives branches that corresponds
to the whole project. Sewers, pluvial system, manouvering and operative
yards, and other facilities are included in the project.
The Firm developed the basic and detailed design of the whole project
as well as Work Management.
|