Profile
Services

Projects

In Progress

Clients
Staff
Contact
 
Projects:
ZÁRATE Terminal
EXOLGAN Container Terminal
EUROAMÉRICA Port Complex
International Bids
Sur Logistic Park
Ribera Sud Railway Terminal
Torres el Faro Fundations Project

San Antonio Este Floating Berth Expansion

Cold Storage HANDELSVEEM - ZÁRATE
Natal RGN (Brazil), Refrigerated cargo terminal
ODFJELL Terminal - Campana
Railroad Station - Zárate Terminal
Maripasa Port Terminal
Marsud - Reefer Container Terminal - Brazil
High Performance Train Project – Bs. As. Rosario
San Antonio Este Port – Maintenance Plan
Mbopicuá – Forest Products Terminal
Dock Sud - Morro Oeste Widening
River Piers at Esperanza and Pirai Ports
Lumut Heavy Cargo Pier (Malaysia) and Batam Pier (Indonesia)
San Antonio Este Pier Repair
Guayaquil Port Terminal
Assessment of Punta Colorada Port
Pier Extension - Fray Bentos
Depot Cubatao
Premises for Minerals in Matarani Port
MOLCA Grain Terminal
Container Terminal Extension in Montevideo
VITCO Liquid Bulk Cargo Terminal
IPS Algeciras
American Logistic Plant
Bahía Ancón Container Terminal - Peru
Punta Vegueta Minerals Termianl Project - Peru
Puerto Cortez Container Termianl - Honduras
Río de la Plata Terminals Extension
ODFJELL Chemical Products Terminal, Mejillones - Chile
    MOLCA Grain Terminal
Client: Molinos Cañuelas S. A.
Location: Lima, Buenos Aires.
Builder: Pilotes Trevi S. A.
Period: 2005 / 2006
Cost: US$ 10.000.000
Services:
Port and Transport Engineering Projects

Project description:

It consists of a multipurpose terminal project. The general project for the general cargo and container area and the executive project for the grain terminal are being developed; the firm is in charge of their civil works.

The firm develops the pier bid and construction project for all the water works, as well as the soil movement and foundation works.

The water works are currently in progress.