Profile
Services

Projects

In Progress

Clients
Staff
Contact
 
Projects:
ZÁRATE Terminal
EXOLGAN Container Terminal
EUROAMÉRICA Port Complex
International Bids
Sur Logistic Park
Ribera Sud Railway Terminal
Torres el Faro Fundations Project

San Antonio Este Floating Berth Expansion

Cold Storage HANDELSVEEM - ZÁRATE
Natal RGN (Brazil), Refrigerated cargo terminal
ODFJELL Terminal - Campana
Railroad Station - Zárate Terminal
Maripasa Port Terminal
Marsud - Reefer Container Terminal - Brazil
High Performance Train Project – Bs. As. Rosario
San Antonio Este Port – Maintenance Plan
Mbopicuá – Forest Products Terminal
Dock Sud - Morro Oeste Widening
River Piers at Esperanza and Pirai Ports
Lumut Heavy Cargo Pier (Malaysia) and Batam Pier (Indonesia)
San Antonio Este Pier Repair
Guayaquil Port Terminal
Assessment of Punta Colorada Port
Pier Extension - Fray Bentos
Depot Cubatao
Premises for Minerals in Matarani Port
MOLCA Grain Terminal
Container Terminal Extension in Montevideo
VITCO Liquid Bulk Cargo Terminal
IPS Algeciras
American Logistic Plant
Bahía Ancón Container Terminal - Peru
Punta Vegueta Minerals Termianl Project - Peru
Puerto Cortez Container Termianl - Honduras
Río de la Plata Terminals Extension
ODFJELL Chemical Products Terminal, Mejillones - Chile
    Assessment of Punta Colorada Port
Client: LOGINTER
Location: Punta Colorada, Río Negro.
Builder: LOGINTER
Period: 2004
Services:
Bid Analysis– Presentations - Feasibility Studies – Consulting and Technical Reports

Project description:

At presente there is a project to activate Sierra Grande mine. The company in charge of the project has Chinese capitals and it has entrusted operation of the pier to Loginter.

Loginter requested an assessment of possible extensions and operative modifications and the necessary studies to submit its operative proposal to the principal.

With the results of the assessment, Loginter is awarded the contract to operate the loading bay of the minning project, which is currently under execution.