Projects:
ZÁRATE Terminal
EXOLGAN Container Terminal
EUROAMÉRICA Port Complex
International Bids
Sur Logistic Park
Ribera Sud Railway Terminal
Torres el Faro Fundations Project

San Antonio Este Floating Berth Expansion

Cold Storage HANDELSVEEM - ZÁRATE
Natal RGN (Brazil), Refrigerated cargo terminal
ODFJELL Terminal - Campana
Railroad Station - Zárate Terminal
Maripasa Port Terminal
Marsud - Reefer Container Terminal - Brazil
High Performance Train Project – Bs. As. Rosario
San Antonio Este Port – Maintenance Plan
Mbopicuá – Forest Products Terminal
Dock Sud - Morro Oeste Widening
River Piers at Esperanza and Pirai Ports
Lumut Heavy Cargo Pier (Malaysia) and Batam Pier (Indonesia)
San Antonio Este Pier Repair
Guayaquil Port Terminal
Assessment of Punta Colorada Port
Pier Extension - Fray Bentos
Depot Cubatao
Premises for Minerals in Matarani Port
MOLCA Grain Terminal
Container Terminal Extension in Montevideo
VITCO Liquid Bulk Cargo Terminal
IPS Algeciras
American Logistic Plant
Bahía Ancón Container Terminal - Peru
Punta Vegueta Minerals Termianl Project - Peru
Puerto Cortez Container Termianl - Honduras
Río de la Plata Terminals Extension
ODFJELL Chemical Products Terminal, Mejillones - Chile
    Río de la Plata Terminals
Client: UTE MURCHISON - ROMAN
Location: Puerto Nuevo - Puerto de Buenos Aires.
Period: 1994
Cost: US$ 60.000.000
Services:
Bid Analysis– Presentations - Feasibility Studies – Consulting and Technical Reports

Project description:

The Firm drafted the technical project for the Bidder that was awarded Terminal 1 and 2 in the Bid for the Port of Buenos Aires, whereby Terminals were granted in concession to private operators.

Terminal 1 + 2, which became Terminales Río de la Plata after its privatization, is the most important terminal in the Port of Buenos Aires in size and in service, as well as in container operation volume. It comprises jetties 1 and 2 of Puerto Nuevo, and it covers an area of more than 20 hectares.

Engineer Juan Larrague was hired to elaborate the technical documentation submitted by the Consortium, which included: gravity wall stability analysis, mandatory works project, terminal transformation works project, project of foundation structures for gantry crane mounting and all aspects related to civil works. The Department of Ports approved the project and, thus, the client was awarded the terminal.