Bulk cargo terminals
![](http://www.lgingenieria.com.ar/wp-content/uploads/2018/01/21-TERMINAL-VITCO-crop.jpg)
VITCO TERMINAL
PROJECT: 2 LIQUID BULK CARGO TERMINAL
CLIENT: VITOL S. A.
LOCATION: PARANÁ DE LAS PALMAS RIVER – ZÁRATE, ARGENTINA
PERIOD: 2005 / 2009
INVESTMENT: U$S 7.000.000
WORKS OF THE FIRM:
- PROJECT
- CONSTRUCTION MANAGEMENT
![](http://www.lgingenieria.com.ar/wp-content/uploads/2020/06/21B-TERMINAL-VITCO.jpg)
VITCO TERMINAL
PROJECT: SOUTH LIQUID BULK CARGO TERMINAL RECONSTRUCTION
CLIENT: VITOL S. A.
LOCATION: PARANÁ DE LAS PALMAS RIVER – ZÁRATE, ARGENTINA
PERIOD: 2011
INVESTMENT: U$S 2.750.000
WORKS OF THE FIRM:
- PROJECT
- CONSTRUCTION MANAGEMENT
![](http://www.lgingenieria.com.ar/wp-content/uploads/2020/06/21C-TERMINAL-VITCO.jpg)
VITCO TERMINAL
PROJECT: NORTH LIQUID BULK CARGO TERMINAL RECONSTRUCTION
CLIENT: VITOL S. A.
LOCATION: PARANÁ DE LAS PALMAS RIVER – ZÁRATE, ARGENTINA
PERIOD: 2019
INVESTMENT: U$S 2.150.000
WORKS OF THE FIRM:
- PROJECT
- CONSTRUCTION MANAGEMENT